Reporting Thermal Generation

Find out how to upload Dth generation for a thermal Generator in the CleanCounts Fuels Registry, step by step.

ℹ️ At a glance

  • Who can upload: any user with Generation permissions, reporting as an Independent Reporting Entity (IRE) or as a Self-Reporting Generator.
  • Report 100% of the gas injected at the injection point or point of measurement, even if not all of it will be tracked in CleanCounts.
  • Back up every entry with an injection receipt, meter readout, or invoice.

Before you begin

  • Your Generator must be approved by the CleanCounts System Administrator.
  • Check whether an IRE must report for you. An IRE is required for Generators that participate in a Non-Supported Program, Generators located in Mexico, Generators with multiple feedstocks, and Generators whose generation is eligible for Certificates in both the REC and RTC systems.
  • Know where your gas is measured. Generators connected to a local distribution system are measured at the point of interconnection. Generators connected to an interstate pipeline are measured at the meter at the injection point. Non-interconnected or behind-the-meter Generators use the metering method approved at registration.

Learn more: OPs Section 4.4.2.1, Measurement and Reporting Protocols (p. 39); Section 4.4.5, Requirements of IREs and Self-Reporting Generators (p. 41)

Upload generation

1

Start a new entry

Go to the Generation tab and select Add New Entry.

The Generation tab with the Add New Entry button

2

Enter the generation details

  • Generator: the Generator you're uploading Dth for.
  • Start Date and End Date: the vintage, meaning the dates generation began and ended.
  • Quantity Dth: 100% of the gas injected at the injection point or point of measurement.
  • Is this 100% renewable? Declare whether all the generation came from renewable sources, or whether the Generator used non-renewable sources.

You can upload a whole month at once or in partial months, as long as the whole month is uploaded.

Learn more: OPs Section 4.4.1, Generation Upload Process (p. 38)

The generation details screen

Why report 100%? Reporting all the gas injected, even gas that won't be tracked in CleanCounts, prevents double counting and lets CleanCounts serve as a central repository for the generation.

Learn more: OPs Section 4.4.2.1 (p. 39)

3

Allocate the generation

Designate the exact quantity or percentage of the generation you're seeking Certificates for. Certificates are only created for Qualified Generation.

  • Qualified Generation: generation that qualifies for Certificate issuance and is reported into a program or market that CleanCounts supports.
  • Non-Qualified Generation: generation that isn't eligible for Certificates, such as non-renewable additives or generation intended for a Non-Supported Program (for example, the LCFS or RFS).

Example: a Generator injects 100 Dth and sells 50 Dth into a voluntary market CleanCounts supports and 50 Dth into the RFS. You report all 100 Dth, and Certificates are issued for 50 Dth.

Learn more: OPs Section 4.4.2.2, Certificate Issuance and Non-Qualified Generation (p. 39)

The Allocation screen

Qualified issuance options

Selecting a reason for non-qualification

If non-renewable gas was blended in

Report the Dth of non-renewable fuel or gas blended with your renewable fuel, either as a specific Dth value or as a percentage. It's recorded as Non-Qualified Generation and isn't issued Certificates, but it keeps your entry consistent with your injection documentation. Before you submit, you certify that you've acknowledged any non-renewable fuel that was blended.

Learn more: OPs Section 4.4.6, The Addition of Non-Renewable Fuels (p. 42)

4

Upload the Generation Document

All reported generation must be supported by documentation. Attach an injection receipt, meter readout, or invoice that shows the Dth injected. The CleanCounts System Administrator checks that the Dth you entered matches your document. See Documentation requirements below.

Learn more: OPs Section 4.4.4, Generation Data Submittal Time Restrictions (p. 40)

Uploading the Generation Document

5

Review your entry

Check the generation details you entered and the allocation you selected.

The Review screen showing the entered data

The Review screen showing the selected allocation

6

Save

If everything looks correct, select Save.

Upload within the deadline

Situation Upload deadline
Large Generators (more than 150 Dth/year) 62 days from the generation end date
Small Generators (1 to 150 Dth/year) Up to one year from the generation end date
Historic generation after Generator approval 90 days from the approval date, going back up to 11 years

Generation outside these windows needs CleanCounts approval and may delay your Certificates. Historic generation older than 11 years, or uploaded after the 90-day window, requires a Variance Request.

Learn more: OPs Section 4.4.3, Initial Reporting and Reporting Historic Generation (p. 40); Section 4.4.4 (p. 40); Section 4.5.1, Certificate Creation (p. 46)

What happens after you save

The date and Dth are posted to the Generation Log. Every entry is automatically checked for feasibility, overlapping entries, and gaps in reporting, then shows one or more of these statuses:

Status What it means
Holding Period Applies to all reported generation and gives you a chance to review it. If the administrator doesn't approve it sooner, it's approved automatically after 14 days.
Issued 1 Dth or more. Certificates are now active.
Accepted Less than 1 Dth. It's added to your next month of generation for issuance.
Pending Failed the feasibility check and needs CleanCounts approval. No Certificates are issued while it's pending.
Pending: Fuel Split Waiting for a feedstock allocation on a multi-feedstock Generator.
Pending Date Feasibility Generation occurred outside the 62-day reporting period.

Each Certificate represents 1 Dth, and Certificates are only issued in whole numbers. Partial Dth roll over to your next month of generation until a whole Certificate can be issued.

Learn more: OPs Section 4.4, Generation (p. 38); Section 4.5.1, Certificate Creation (p. 46)

Documentation requirements

CleanCounts accepts generation evidence in this order of preference:

  1. Gas market settlement metering data, such as a pipeline statement or injection invoice, if your Generator is connected to a pipeline.
  2. Metering data that hasn't been through settlement validation, at CleanCounts' discretion.
  3. Measured volume documentation from a commercial or legal transfer to another company, at CleanCounts' discretion.
  4. A measurement system suggested by CleanCounts, if none of the above is feasible.

If you use anything other than settlement metering data, explain why unless CleanCounts has already approved it. Options 3 and 4 also need an independent auditor to agree to the measured volume.

Learn more: OPs Section 4.4.4, Hierarchy of Generation Data Evidence (pp. 40–41)

If you self-report

A Self-Reporting Generator reports its own generation without an IRE, and all Certificates it creates are marked as self-reported. Generation data sent automatically through the CleanCounts API from the injection point doesn't need the same level of documentation as self-reported data.

Learn more: OPs Section 4.4.1 (p. 38); Glossary, Self-Reporting Generator (p. 65)

If your document doesn't show Dth

Your document must include values that let the CleanCounts System Administrator work out the Dth. If that isn't possible, contact the System Administrator before you upload.

How documents are checked

CleanCounts may reject documentation that appears altered, fraudulent, or suspicious, and may confirm a document directly with the entity that issued it. CleanCounts may contact the Generator Owner first, but isn't required to. CleanCounts can also audit submitted Dth totals at any time.

Learn more: OPs Section 4.4.1 (p. 38); Section 4.4.5 (p. 41)

If you need to correct an entry

Let us know as soon as you think generation on your Generation Log is inaccurate.

  • Certificates still in the issuance Account: the issuance is rolled back, and you can report the correct generation.
  • Certificates already transferred or retired: a Prior Period Adjustment is posted to your Generation Log and applied at your next issuance.

Learn more: OPs Section 4.4.9, Changes to Issuances (p. 45)

Need more help?

💬 Email the CleanCounts system administrators at [email protected] or call (651) 900-7891.

📘 Read the full requirements in the Renewable Thermal Tracking System Operating Procedures.


"OPs" refers to the Renewable Thermal Tracking System Operating Procedures (effective 1/19/2025). Page numbers refer to the PDF linked above.